ST. JOHN HOSPITAL ENDOSCOPY

New Elaine E. Blatt Endoscopy Center

  • Client: St. John Providence Health System
  • Location: Detroit, MI
  • Project Duration: 6 months
  • Project Contract Value: $215,000 (USD)
  • Size: 7,500 SF
  • Project Man Hours: 2,110+
  • Services Performed:
    Interiors

« Back To Projects

Complete ground up remodel.

The Endoscopy Department at St. John Hospital and Medical Center in Detroit, Michigan was growing and in need of a new, larger area for the high patient volume they were experiencing, along with room for the advanced technology that was available at the time.

The hospital had a 7,500-square-foot area that could be renovated for the new Elaine E. Blatt Endoscopy Center. The project entailed a complete ground up remodel of the entire area including walls, ceilings, finishes and mechanicals.

CCC provided carpentry services to AIM Construction, construction manager for the project. CCC self-performed all work including interior framing, drywall, drywall finish, doors/frames hardware, wall protection and patient room accessories. The project took six months to complete with over 2,110 man-hours logged on it.

The result was a new space that is twice as large as the previous area, and includes additional procedure rooms offering more privacy and comfort for patients.