ST. JOHN HOSPITAL PHARMACY

Pharmacy Renovations

  • Client: St.John Providence Health System
  • Location: Detroit, MI
  • Project Duration: 3 months
  • Project Contract Value: $190,000
  • Size: 10,000 SF
  • Project Man Hours: 1,700+
  • Services Performed:
    Interiors

« Back To Projects

Constructed within busy pharmacy.

Founded in 1952, St. John Hospital and Medical Center, part of the St. John Providence Health System, is a Detroit teaching hospital (affiliated with Wayne State University) with 772 licensed beds, a 1,300-member medical staff and more that 50 medical and surgical specialties. St. John needed to renovate their existing pharmacy space to meet demand more effectively and efficiently.

CCC was a subcontractor for interiors on the renovation. This was a two-phased project that needed to be constructed within an existing active pharmacy. The scope of work for CCC included interior framing, drywall, drywall finish, doors/frames hardware, wall protection and patient room accessories.

The pharmacy renovation was completed in three months and CCC self-performed all work. Work included metal studs, drywall, acoustical ceilings, doors, frames, hardware, specialties, wall protection and expansion assemblies. Over 1,700 man-hours were logged without a single safety incident.