Client: City of Traverse City
Location: Traverse City, MI
Role: Progressive Design/Build
Originally built in 1932, the Traverse City Regional Wastewater Treatment Plant (TCRWTP) serves roughly 15,000 Traverse City residents, 30,000 township residents, and local industries. The plant is capable of treating 8.5 million gallons per day and helps protect the sensitive environments of the Boardman River and Grand Traverse Bay.
Commercial Contracting Corporation (CCC) was selected for a Progressive Design/Build contract, which places two firms in charge of design, permitting and construction, with Fleis Vandenbrink to replace the first and last treatment stages at the plant. The project focuses on rebuilding the plant’s primary treatment stages and the ultraviolet disinfection for outflow.
Work includes replacing the headworks, grit removal system, (3) screw augurs replaced by submersible pumps, (8) square holding tanks replaced by (2) large round ones, and an ultraviolet disinfection system that has been in place since the 1990s. The city has a consent order with the Department of Environment, Great Lakes and Energy requires the city to replace it by July 2026. Replacing the disinfection system also involves modifying the outflow channel to ensure high waters can’t impact the flow.