248.209.0500 | Auburn Hills | Detroit | Mexico

Novi Meadows

Elementary School
Novi, MI

Novi Meadows

CCC performed all carpentry construction of exterior walls, interior walls and ceilings for the Novi Meadows Elementary School. Phase 1 of the two phase project involved partial demolition and a 142,506 square foot, two-story building addition to the school. The two-story building displays open ceilings and industrial-style designs throughout the building. New areas include a new media center, classrooms and STEM labs. Phase 2 included renovations to 41,274 square feet of the existing building. A new cafeteria, large gymnasium, art rooms complete with kilns, choir room and band room were some of the new spaces in Phase 2.

Throughout both phases CCC constructed the exterior metal framing. The interior work included construction of metal stud partitions, drywall and acoustical ceilings. This work included miles of taping and finishing to install a 3/8” reglet drywall reveals both vertically and horizontally to create a clean and create seamless transitions throughout the facility connecting dissimilar wall and ceiling finishes. The project also included installation of special sound absorbing acoustical wall panels.

LocationNovi, MI
ClientMcCarthy & Smith
CCC RoleInteriors, General Trades
Size201k sq. feet total
CALL CCC TODAY