248.209.0500 | Auburn Hills | Detroit | Mexico

Conrail Pipe Bridge

Marathon Petroleum
Detroit, MI

Conrail Pipe Bridge Installation

CCC successfully rigged and set the new 140’ pipe bridge, weighing 90,000 lbs, over the Conrail railroad tracks between the Marathon Detroit refinery and the adjacent Detroit Salt property. This pipe bridge refeeds two product lines that currently run under the track to the asphalt plant.

ClientMarathon Petroleum
RoleConrail Pipe Bridge Installation
LocationDetroit, MI
CALL CCC TODAY