Client: Marathon Petroleum
Location: Detroit, MI
Role: Conrail Pipe Bridge Installation
CCC successfully rigged and set the new 140’ pipe bridge, weighing 90,000 lbs, over the Conrail railroad tracks between the Marathon Detroit refinery and the adjacent Detroit Salt property. This pipe bridge refeeds two product lines that currently run under the track to the asphalt plant.