Client: Great Lakes Water Authority
Location: Detroit, MI
Role: General Contractor
Commercial Contracting Corporation was contracted by the Great Lakes Water Authority (GLWA) as the General Contractor for improvements to the Water Works Park HVAC system. Scope of work for the project included replacement of existing chlorine and ozone ambient air and water monitors, repairs to existing concrete, new make-up air and exhaust equipment ductwork, natural gas piping and appurtenances, and demolition of existing HVAC, ductwork, gas piping, controls, and electrical circuits.
Additionally, the SOW included providing new:
• Electrical panels, conduits, and circuits
• Feeders from existing unit substation to new panels
• Structural reinforcing for new HVAC penetrations
• Snorkel exhaust in pilot plant control room
• Lab exhaust fan to replace existing systems
• HVAC control system
CCC was also responsible for determining the working environment and providing all equipment, temporary ventilation, personal protective equipment, as required to maintain safe working conditions.