East Lansing Meridian Township – Filter & Backwash Recovery & Lagoon Decant

Filter Backwash Recovery & Lagoon Decant Disposal

East Lansing Meridian Township

Client: East Lansing Meridian Water & Sewer Authority (ELMSWA) 

Location: East Lansing, MI

Role: Design/Build

The East Lansing-Meridian Water & Sewer Authority Water Treatment Plant was constructed in 1973, and last upgraded in 1993. The facility serves over 75,000 residences and businesses throughout East Lansing and Meridian.

To improve reliability at the plant, Commercial Contracting Corporation was contracted to provide Design/Build services for the construction of a closed-cycle filter backwash reclamation system with lagoon disposal. Installation of filter backwash reclamation would ensure the microbiological purity of the water and eliminate potential contamination from cryptosporidium, giardia, fecal coliform and other harmful microorganisms from the surface water source.

CCC’s scope of work included the construction of a covered, cast-in-place, concrete backwash water tank including pump station, yard piping, utilities and site work. Our teams were also responsible for the rehabilitation of the existing Pump Station Building on-site, installation of sheeting, reconstruction of the lime sludge lagoon adjacent to the new backwash tank area, and site restoration and pavement. CCC also self-performed all concrete work on the project.

CALL CCC TODAY