CCC Proud to be Part of Chrysler 200 Factory

In 2011, Chrysler announced a new body shop for Sterling Heights Assembly Plant (SHAP). CCC was chosen as the general contractor for the installation of all body shop and trim/chassis/final equipment for the plant.

Much of the work, almost 90% of the 200,000 man-hours, was completed in a five-month time period. CCC worked two shifts, six days a week to ensure that the job was kept on schedule.

CCC is proud to have been a part of the Chrysler 200 Factory, where the 2015 Chrysler 200 vehicles are manufactured. Go here to see the Chrysler 200 Factory Tour of a world-class manufacturing facility.