Home  |   Employment  |   Contact Us  |   Bid Room
Corporate Profile Quality & Safety Markets Services Portfolio News Online Documents
<< Back to Portfolio

General Motors: Lansing Delta Township

Commercial Contracting Corporation’s first project was for General Motors in 1942 and 60 years later GM still entrusts CCC with some of their most challenging jobs. This includes work on their state‐of ‐the‐art assembly facility, green field facility: Lansing Delta

Township (GM‐LDT). In 2005, CCC was awarded the installation of all tooling and equipment for the GMLDT program. This included the general assembly and body shop along with the ventilation and fire protection for the entire general assembly. We also constructed a new central utilities complex that supplied energy to the entire site. In addition to of all of this, CCC was also responsible for the management of all mechanical, electrical and painting contractors. This project would become the single largest equipment installation in CCC’s history.

Because of our outstanding performance around safety, timing, and budget on such a large project with so much simultaneous work being done on one site, CCC was named GM’s Global Supplier of the Year in General Construction Services. Upon completion, GM‐LDT was certified a LEED Gold Building making it the first automobile manufacturing facility in the world to receive any level of LEED certification. The 3.4 million square foot building employs over 4,000 people and is responsible for the production of the four different crossover vehicles.

CCC has performed every equipment rework and installation for GM at the Lansing Delta Township plant and we are still present at the facility today.

Download PDF


Copyright © Commercial Contracting Group | All Rights Reserved | Privacy Policy
Web Experience By: Basso Design Group